Projects

Home Projects Murat Özer Çamlıca Residential Project
Murat Özer Çamlıca Konut Projesi

Murat Özer Çamlıca Residential Project

The project consists of a reinforced concrete structure constructed as a single block on a 1,635 m² land area, with a total of 9 floors (3 basement floors and 6 standard floors). In this project, where we served as the subcontractor for the structural works, the total construction area is 11,000 m².

Location

Bursa/Nilüfer/Çamlıca

Employer

Murat Özer İnşaat

Start/End Date

2025 / 2026

Project Area

11.000 m2

Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi
Murat Özer Çamlıca Konut Projesi