Kenan Doğan
He possesses a resilient and determined spirit that has propelled both his educational and professional endeavors forward.
Until 2005;
He had been actively involved in hospital and prefabric construction in Yalova, Earthquake housing, business centers, and road-infrastructure in Gölcük, Düzce and Kaynaşlı, School and business center in Bingöl, Hospital in Hizan, Bitlis, BTC oil pipeline pumping station in Sivas, various project construction sites.
Between 2005 and 2018;
He worked in Afghanistan, Iraq, Romania, Azerbaijan, Turkmenistan, Saudi Arabia, and South Africa for 13 years on large-scale projects.
In the interim periods;
He had experience in Solar Power Plant installation works in the Erzurum region. He had experience in Solid Waste Storage Facility works in Gaziantep, Kütahya Emet, and TRNC Nicosia regions.
Between 2018 and 2020;
He continued his business life with DownTown mixed life project in Bursa.
Towards the end of 2020;
He decided to continue his business life commercially and established “İŞBÜKEN YAPI İNŞAAT SAN. TİC. LTD. ŞTİ” on 12.11.2020.
He has a Bachelor’s degree in Civil Engineering and speaks English, Farsi, and Romanian.
He has the necessary technical proficiency and has received the necessary training in Operational and Systems Engineering, CAD programs, ISO 9001 Quality Management, Internal Auditor, ISO 14001 Environmental Management, OHSAS 18001 Occupational Health and Safety.
Integrated Management, Teamwork and Management Skills. He had experience in project design and implementation, super-exposure, as-built,quantity surveying, earthworks, infrastructure, roads, hard landscaping, rough and finishing works to the finest details, and has taken activeresponsibility in all work items.
He has a self-developed, challenging, self-sacrificing, stable,open to innovation, reliable, and honest personality.
Pre-Company Professional Life
2,5 years - HOUSING, HOTEL, SHOPPING
HOUSING, HOTEL, SHOPPING, LIFE AND ENTERTAINMENT CENTER PROJECTS
DOWNTOWN prj. / 9 hectares of floor area, 600.000m2 construction area, 61.000m2 green and social area, 71.000m2 Shopping Center, 13 units. It includes 1,008 flats consisting of high-rise blocks, 4,000 car parking garages, school, dormitory and mosque constructions. FSM BULVAR, WESTPOINT, MAVIDEN CITY, MEVSIM MUDANYA, ARYA MUDANYA Its projects are housing projects in different locations, different sizes and features.
8 years - TEPE CONSTRUCTION
TURKMENISTAN : PROJECT OF 8 GRAIN STORAGE AND PROCESSING INDUSTRIAL PLANTS
Grain storage and processing plants were built in 8 different provinces in 4 different states in Turkmenistan. Each one was built on a terrain of 50.000 square meters, totaling 400.000 square meters and has a capacity of 360 thousand tons. Each plant has a construction site of 124.000 square meters (steel assembly on base), a road area of 126.000 square meters, 17.000 square meters of infrastructure and 150.000 squaremeters of green field.
IRAQ : NEW SULAYMANIYAH UNIVERSITY CAMPUS PROJECT
The project was built on a construction site of 363.000 square meters on a terrain of 190 hectares and includes 156.000 square meters of hard landscape area, 64.000 square meters of infrastructure length, outdoor and indoor sports fields and earth movements, landscaping works and some additional works.
AFGHANISTAN : AIRPORT REGION, ISAF MILITARY CAMP PROJECT
It includes camp buildings, heliports, concrete roads, infrastructure works and landscaping works on a terrain of 443.394 square meters Along with topographic works, organization of earthwork operations, following up machinery and equipment works and delivery of works to supervision companies were conducted.
SİVAS / Turkey : BTC OIL PIPELINE, SİVAS PT4 PUMPING STATION PROJECT
I have gained significant experience in this project composed of 50% mechanical and steel construction which necessitated a very sensitive workmanship and surveying work.
2 years - YENIGÜN CONSTRUCTION
SAUDI ARABIA / KHURAIS: SAUDI F-15 FLEET MODERNIZATION PROGRAM, (RSAF) KHURAIS ELECTRONIC WARFARE RANGE
Tutor Perini Within 70.000 hectares of land, 110 km embankment, 92 km stabilized road, 50.000 m2 stabilized runway, 40.000 m2 asphalt, 700.000 m3 excavation / fill, 50.000 m2 construction area, 14 different points (10.000 barrels, 1100 containers, 4500 vehicle tires) Includes current jobs.
SAUDI ARABIA/JEDDAH JEDDAH AIRPORT AIRCRAFT MAINTENANCE HANGARS PROJECT
It was built by TAV Construction and includes 140.00 tons of plant mix base, 150.000 tons of hot mix and 50.000 tons of asphalt works on a floor area of 300.000 square meters in a land of 90 hectares.
2 years - OZER CONSTRUCTION
ROMANIA : REAL ESTATE DEVELOPMENT PROJECT (Belleview Sinaia Housing)
ROMANYA : GAYRIMENKUL GELISTIRME PROJESI ( Belleview Sinaia Konut ) Bored pile was implemented due to steep land. 30.000 square meters of indoor space, parking lot and parking garage, swimming pool and indoor sports hall along with some infrastructure works were completed.
(1 year)
AFGHANISTAN / YUKSEL CONSTRUCTION : AMERICAN BASE (AIRPORT) APRON PROJECT.
I was contractually appointed on a project basis to American Base (Airport) Apron Project; topographic works of concrete pavement of apron area of 110.000 square meters, including sub-bases.
AZERBAIJAN / MAKYOL-AZER CONSTRUCTION : BAKU BELTWAY PROJECT.
I was appointed to Baku Beltway Project towards its completion; it includes 21 kilometers of main road and 11 kilometers of byways.
3,5 years - BERIL CONSTRUCTION
DÜZCE, GÖLCÜK, YALOVA, BİNGÖL, BİTLİS, KAYNAŞLI / TÜRKİYE : "BERİL HARİTA"
I have worked for 3.5 (three and a half) years within this mapping company for the below projects.
1)YENIGUN CONST./CONST. of DÜZCE PERMANENT EARTHQUAKE HOUSING / ROAD AND INF.
2) OYAK CONST./ CONSTRUCTION of GÖLCÜK BUSINESS CENTERS.
3) MERCAN CONST./ CONSTRUCTION of YALOVA THERMAL SII HOSPITAL.
4) GIRISIMCILER CONST./ CONSTRUCTION of BİNGÖL SCHOOL AND BUSINESS CENTER.
5) MERCAN CONST./ CONSTRUCTION of BİTLİS HİZAN STATE HOSPITAL
6) BARMEK CONST./ CONSTRUCTION of KAYNASLI PERMANENT EARTHQUAKE HOUSING ROADS.
1 year - OZYAPICILAR CONSTRUCTION
GOLCUK / TURKEY: PREFABRICATED AND PERMANENT EARTHQUAKE HOUSING PROJECT
Within the scope of road and infrastructure construction.
SPP and Waste Facility
Solar Power Plant installation works in Erzurum region, Solid Waste Storage Facility works in Gaziantep, KütahyaEmet, TRNC Nicosia regions.