Karadeniz İskele Factory Project 2
The project consists of a single-block factory designed on a 2,000 m² land area, featuring a 3,500 m² enclosed space. It includes both reinforced concrete structures and prefabricated components. As the subcontractor for structural works, our scope of work includes: