Karadeniz İskele Factory Project 1
The project encompasses a single-block factory, designed as a reinforced concrete building with a closed area of 2,100 m2, situated on a land area of 2,575 m2, inclusive of prefabricated manufacturing facilities. The rough works constitute the scope of work assigned to our company in the project where we operate as a subcontractor;