Baski Prefabricated Additional Service Building Project
The project consists of a two-storey light steel structure constructed within the premises of BASKİ General Directorate, with a building footprint of 350 m² and a total enclosed area of 700 m². As the main contractor of the project, we were responsible for the preparation of architectural, structural and implementation projects, the development of licensing (permit) drawings, the manufacturing of the light steel structural system within the project scope, as well as the execution of all architectural works together with mechanical and electrical installations. The building was completed and delivered on a turnkey basis in accordance with the relevant technical specifications and applicable regulations.