10 Bed Integrated District Hospital
The project entails the construction of a 10-bed Integrated District Hospital building on a 13,323 m2 property, featuring a seating area of 1,051 m2 and a closed area of 3,143 m2. In the project where we operated as a subcontractor for the initial construction phase, we successfully completed the construction of 2000 m2 of foundations and retaining walls. However, the project faced an interruption as the contract between Soykar Group and the Ministry of Health was terminated.