BURSA / OSMANGAZI / OVAAKÇA:
Employer: Işıksoy Tekstil İnşaat Taahhüt San. Ve Tic. A.Ş.
Project Start Date: 2023
Project End Date: Ongoing
The project comprises two adjacent warehouse blocks, designed as a reinforced concrete building, with a floor area of 3,255 m2 and a closed area of 7,280 m2, situated on a land area of 5,440 m2, and it includes prefabricated constructions.
The structure, composed of 42 sockets on a continuous foundation, incorporates earthquake walls and slabs reaching heights of up to 9.5 meters.
The rough works constitute the scope of work assigned to our company in the project where we operate as a subcontractor;
- Bored pile girder beam
- Permanent foundation and socket
- Foundation bond beam
- Columns and earthquake walls
- Slabs and intermediate beams (h=9,00 mt)
- Stairs
- Garden Wall